Views: 0 Author: Site Editor Publish Time: 2025-10-17 Origin: Site
Check before starting, confirm that the water level, pressure gauge, safety valve and other instruments are normal, and the valve switch position is correct.
Monitor the operating parameters to keep the pressure and water level within the specified range, and avoid overload operation or frequent start and stop.
The sewage shall be discharged according to the regulations, and the sediment and sewage at the bottom of the boiler shall be discharged regularly to ensure the cleanliness of the water quality.
It is strictly prohibited to operate in violation of regulations, to modify the parameters of safety devices without authorization, to use unqualified fuel, and to operate beyond load.
